Oakley High School

$500K Damage Mitigated
$100K Materials Restored
$2600 Business Continuity

Photo Gallery

Reason For Call

The roof of the Oakley High School gymnasium was leaking. There was standing water on their gym floor.

Scope Of Work

We dried a 5-layer gym floor. We utilized a negative air system under the gym floor. We set up tents and projected heated air directly onto the affected materials.

We prevented approximately 3 months (90 days) of downtime for the gym.